Press release
12 November 2024
The Phnom Penh Water Supply Authority has awarded VINCI Construction Grands Projets the contract to extend the drinking water production plant supplying Bakheng, located in the north of Cambodia's capital. This €94 million design-build contract covers construction of a new raw water intake from the Mekong river and a new line with capacity to treat 195,000 cu. metres of water a day. The construction site will employ 1,600 people at its peak. A large majority of the workers and supervisors will be Cambodian, women are expected to account for 30% of the workforce, and VINCI Construction Grands Projets will train them in building trades. From an environmental perspective, VINCI Construction Grands Projets will:
- use concrete that emits 30% less carbon than standard local equivalents;
- set up a 3,500-panel (9,000 sq. metre photovoltaic array) to cover 15% of the facility's energy requirements;
- deploy Smart Users, an innovative solution developed by its subsidiary WMI to measure and manage water consumption at the worksite and facilities (including offices and concrete plant).